Fort Myers Land Surveying

Local Land Surveyors in Fort Myers , TX

Fort Myers Land Surveying
(239) 800-0481
Fort Myers Land Surveying
  • Home
  • ALTA Survey
    • Bowling Green, KY
    • Clarksville, TX
    • Jackson, MS
    • Jackson, TX
    • Lexington, KY
    • Louisville, KY
    • Memphis, TX
  • Boundary Surveying
  • Construction Survey
  • Drone LiDAR Mapping
  • Elevation Certificate
  • Land Surveying
  • Topographic Survey
  • About Us
  • Contact Us
Home - Page 2 << 1 2 3 4 … 27 28 >>

Post navigation

← Older posts
Newer posts →

LiDAR Mapping for Preliminary Solar Site Planning and Evaluation

Fort Myers Land Surveying Posted on November 7, 2026 by FortMyersSurveyorNovember 6, 2026
Drone LiDAR mapping survey of a large open property for preliminary solar panel site planning.

LiDAR mapping measures the ground, trees, and drainage across the whole site in one pass, giving the team real numbers to screen the land and sketch a first layout. A parcel can look perfect for solar from a satellite image and still fall apart on paper. Hidden low spots flood the array area, a tree line shades the south edge every winter afternoon, and the only access route crosses soft ground no crane can use. Solar developers and landowners need to find those problems before signing a long lease or paying for full engineering. 

Assessing Solar Development Land With LiDAR Mapping

Early solar screening is about speed and coverage. Developers often compare several parcels at once, and walking every acre with a ground crew takes too long and costs too much at this stage. A drone or aircraft LiDAR mapping flight can capture hundreds of acres in a day.

The scan records millions of measured points on the ground and every visible feature. Surveyors sort those points into bare ground, vegetation, buildings, and other classes. The result shows the terrain, tree heights, existing structures, and drainage paths across the full parcel.

That data answers a basic question fast: how much of this land can actually hold panels. It also flags problem areas early, so the team can drop a weak parcel or adjust the deal before spending heavily on design.

Identifying Terrain Slopes and Suitable Solar Panel Areas

Slope drives solar layout. Racking systems have limits on how much grade they can handle, and those limits differ between fixed-tilt systems and single-axis trackers. Steeper ground can mean more grading, more pile length variation, or areas that drop out of the layout entirely.

LiDAR elevation data turns into slope maps that color-code the site by grade. Designers can compare those maps against the racking manufacturer’s tolerances. Areas that work, areas that need grading, and areas to avoid show up clearly.

Slope direction affects output as well as cost. Ground tilting toward the sun can help, while ground tilting away may need taller racking or wider row spacing. The same elevation data shows aspect, so designers can weigh both factors early.

LiDAR Mapping Vegetation and Potential Shading Obstacles

Shade cuts energy production, and trees are the usual culprit. LiDAR mapping captures the tops of trees and the ground beneath them, so the data shows tree heights and locations across the site and along its edges. Designers use that information to model how far shadows reach at different times of year.

Edge trees on neighboring property are especially important. You may not be able to clear them, so the layout has to work around their shadows. Measured heights let designers set buffers instead of guessing.

The vegetation data also helps estimate clearing. Knowing how much woodland or brush covers the array area affects cost and schedule. Some trees or habitats may be protected, and wetlands need their own evaluation, so check environmental rules before planning removal.

Evaluating Drainage Patterns and Solar Site Access Routes

Solar sites can’t sit in standing water. Low areas, flow paths, and ditches show up clearly in a LiDAR terrain model. That lets designers keep equipment, inverters, and roads out of spots that hold water after heavy rain.

Panels also change how water moves. Runoff concentrates along panel drip lines and can erode bare soil between rows. Stormwater rules for solar projects vary by state, county, and municipality, so the engineer should confirm what applies before final design.

Construction needs access for trucks, pile drivers, and cranes, and operations need roads for maintenance. The terrain data shows where routes can follow firm, gentle ground. It also shows where roads may need culverts to cross ditches or drainage paths.

Access ties into legal questions too. Routes crossing other properties may need recorded easements, and interconnection lines may follow existing utility corridors. A boundary survey and title review answer those questions, since LiDAR shows the ground and not who owns it.

Using LiDAR Mapping Survey Data for Preliminary Solar Layout Decisions

With slope, shading, drainage, and access mapped, the team can sketch a first layout. Designers mark exclusion zones such as wetlands, flood-prone areas, steep slopes, setbacks, and easements. What’s left is the usable array area.

That preliminary layout supports several early decisions:

  • Estimating likely system size on the parcel
  • Comparing competing parcels side by side
  • Planning rough grading and earthwork quantities
  • Identifying where more detailed survey work is needed

Preliminary data has limits. Design-grade work usually needs ground control, field checks, a boundary survey, and utility locating. LiDAR mapping can’t see buried pipes or map underwater areas, and accuracy depends on vegetation density, flight height, and processing. Plan those next steps into the schedule, especially when permits or financing depend on the survey.

Frequently Asked Questions

How early should LiDAR mapping be used in a solar project?

It works best during site screening, before committing to a parcel or detailed design. At that stage, broad coverage matters more than design-level detail. The data helps rule out weak sites quickly. Detailed survey work can follow once a parcel moves forward.

Can LiDAR mapping see the ground under trees?

Partly. Laser pulses pass through gaps in the canopy and reach the ground in many wooded areas. Very dense vegetation reduces how many points get through. Field checks can confirm ground elevations in heavily wooded spots.

Does LiDAR mapping replace a boundary survey for a solar site?

No, the two do different jobs. LiDAR measures terrain and visible features, while a boundary survey establishes legal property lines and easements. Leases, financing, and permits usually need boundary information. Plan both for any site that moves past early screening.

Posted in LiDAR mapping | Tagged lidar mapping

Metes and Bounds Survey for Older Florida Legal Descriptions

Fort Myers Land Surveying Posted on November 4, 2026 by FortMyersSurveyorNovember 3, 2026
Metes and bounds survey of an older Fort Myers Florida property showing boundary lines, measured bearings, distances, survey monuments, and adjoining parcel boundaries.

A metes and bounds survey turns that old language into a boundary you can find, defend, and build on, and it’s worth ordering before you buy, sell, split, or develop a parcel with an older description. Pull an old deed from the county records and you might find a boundary that starts at a “lightwood stake” or runs “to the edge of the pond.” Those references made sense to whoever wrote them decades ago. Today the stake is gone, the pond has shrunk, and the description may not even close on paper. 

Understanding Metes and Bounds Survey in Older Florida Property Records

Many older parcels were never part of a recorded subdivision plat. Their deeds describe the land as a series of courses that start from a fixed point and travel around the perimeter. Rural acreage, older waterfront tracts, and parcels carved out of larger family holdings are common examples.

These descriptions reflect the tools and landmarks of their time. A call might reference a section corner, a road centerline, a fence, or a tree. Some were drafted by surveyors, while others were typed up by whoever prepared the deed, and the difference often shows. Expect to see a few recurring parts.

  • A point of commencement tied to a known corner or monument
  • A point of beginning where the parcel boundary actually starts
  • A sequence of bearings and distances around the perimeter
  • An acreage figure, often followed by “more or less”

Each piece carries different weight when a surveyor rebuilds the boundary. The acreage figure tends to carry the least. Buyers who rely on it to judge what they’re getting are often surprised.

Interpreting Bearings, Distances, and Historical Boundary References

Bearings in older deeds weren’t always measured the same way. Many were based on magnetic north at the time, and magnetic north drifts over the years. A surveyor has to work out the basis of bearings the original writer used before comparing it with modern measurements.

Distances can be just as tricky. Older records may use chains, rods, or links, and some figures were rounded or measured over rough ground with less precise equipment. A small error repeated across several courses can leave a description that never returns to its starting point.

Historical references need field checking too. A ditch, a fence, a shoreline, or a road can shift over time or disappear completely. The surveyor’s task is to find what remains on the ground and figure out what the original writer meant.

Reconciling Old Legal Descriptions With Existing Survey Evidence

Paper and ground rarely agree perfectly. A metes and bounds survey compares the deed calls with physical evidence such as found monuments, old fences, prior surveys, and the descriptions of adjoining parcels. Where they conflict, the surveyor weighs which evidence best reflects the original intent.

Surveyors commonly give more weight to original monuments than to bearings and distances, and more weight to those calls than to stated acreage. That order isn’t absolute, and how a conflict gets resolved can vary with case law and the facts of each parcel. This is general information and not legal advice, so bring in a real estate attorney if a conflict affects ownership.

Ask your surveyor to explain the evidence behind the final lines. A good drawing or report notes which monuments were found, which were set, and where the record and the ground didn’t match. That record helps a title company, a lender, or a future surveyor follow the decisions later.

Identifying Gaps and Overlaps Between Adjacent Parcels

Older descriptions written at different times by different people don’t always fit together. Sometimes two neighboring deeds claim the same strip of land. Other times a sliver sits between them that neither deed covers.

These conflicts tend to surface during a sale, a refinance, or a development review, which is the worst possible time to find them. A surveyor checks the adjoining deeds along each line and maps them together on one drawing, so overlaps and gaps become easy to spot. Most of them trace back to a short list of causes. Here are the usual suspects.

  • Different starting points for neighboring descriptions
  • Bearings measured from different bases
  • Rounded distances or typos copied into later deeds
  • A larger tract divided several times without a fresh survey

Fixing a gap or overlap may involve a boundary line agreement, corrective deeds, or a court action. The right path turns on the evidence and whether the neighbors agree, and the earlier conveyance may carry priority in some situations. Get legal advice before signing anything that changes a recorded line.

Documenting Verified Boundaries for Property Transactions and Planning

Once the lines are settled, the results need to land in a form others can rely on. A signed and sealed survey shows the verified boundary, the monuments found and set, and any encroachments, gaps, or overlaps. Many surveyors also prepare an updated legal description tied to a clear basis of bearings.

Title companies use that work to review exceptions, and lenders may require it before closing. Planners and engineers need it before they lay out a lot split, a new building, or a driveway. Requirements vary by lender, title company, county, and project scope, so confirm what each party needs early.

Store the survey with your deed and title policy. A future buyer or neighbor will have a much easier time if the verified boundary is already documented. Some owners also record the new description or a boundary agreement so the improved language follows the property.

Frequently Asked Questions

When do I need a metes and bounds survey?

You’ll usually want one when an older parcel changes hands, gets refinanced, or is about to be divided or developed. It also makes sense when a fence or building sits near a line the deed describes vaguely. Lenders and title companies may require a current survey for certain transactions. Confirm requirements early so the survey doesn’t delay closing or permitting.

Can I just rewrite the old legal description?

Not on your own, and not without field work behind it. A new description should come from verified measurements and be prepared or reviewed by a licensed surveyor. Changing a recorded description can affect your neighbors and your title, so an attorney should be involved. The title company will also want to review any new language before it’s used.

Why doesn’t my deed’s acreage match the survey?

Stated acreage in older deeds was often an estimate. Rounded distances, old measuring methods, and later changes to roads or shorelines all affect the calculated area. Surveyors generally give acreage less weight than monuments and courses. A difference doesn’t automatically mean you lost land, but it deserves a conversation with your surveyor and title company.

Posted in boundary surveying | Tagged boundary survey

How Do You Find Property Lines Before Starting Excavation Work?

Fort Myers Land Surveying Posted on November 2, 2026 by FortMyersSurveyorOctober 30, 2026
Find Property Lines Before Excavation Work Using a Professional Land Survey

The good news is that you can find property lines with a clear process before any machine shows up. Start with the records, look for the markers, and bring in a licensed surveyor when the dig gets anywhere close to the boundary. That order saves time, money, and a lot of second-guessing in the field. Property owners, builders, and site contractors all share this risk. 

An excavator can dig a trench across the wrong side of a boundary in about ten minutes. Undoing that mistake can take months. A pool hole that crosses into a neighbor’s yard, a drainage swale cut through an easement, or a foundation dug too close to the line can lead to stop-work orders, redesign costs, and strained relationships next door.

Reviewing Property Records Before Planning Excavation

Your paperwork is the first place to look. The deed describes the parcel, and the recorded plat shows how the lot was laid out when the subdivision was created. If you have a prior survey from a purchase or refinance, it may show the boundary lines, corner markers, and any improvements that existed at the time.

County property appraiser maps and online GIS layers are helpful for a quick look. They aren’t precise, though. These maps can be off by several feet or more, and they aren’t meant to settle where a legal boundary sits. Use them to get oriented and never as a guide for digging.

Gather these items before you plan the work:

  • Your deed and legal description
  • The recorded plat for your subdivision, if one exists
  • Any past boundary or mortgage survey
  • Your title policy or title commitment, which may list easements

Check the date on any old survey. Fences, sheds, and driveways may have changed since then, and those changes can affect your plans.

Locating Existing Boundary Markers on the Property

Boundary markers are the physical points a surveyor set at property corners. They’re often iron rods or pipes driven into the ground, and many have a plastic or metal cap stamped with the surveyor’s license number. Some properties also have concrete monuments, especially along subdivision lines and road rights-of-way.

Markers are usually a few inches below the surface. Grass, mulch, and years of landscaping can bury them, and past construction may have knocked them out of place. A metal detector can help you spot one. Finding a rod doesn’t confirm it’s still in its original position, and that matters a lot when heavy equipment is about to work nearby.

Fences, hedges, and walls are poor guides too. People often build them a little inside or outside the true line, and they don’t always match the deed. If you want to find property lines you can trust for excavation, treat any marker you uncover as a clue that still needs confirmation.

When a Boundary Survey Is Needed Before Excavation

A boundary survey is a professional survey that locates and marks the legal limits of your parcel. A licensed surveyor researches the records, measures the property, and sets or recovers corner markers. You get a signed drawing showing where the lines fall.

A survey is a smart move in these situations:

  • The excavation will come within a few feet of a property line
  • You can’t find corner markers, or they look disturbed
  • Your last survey is old or doesn’t match current conditions
  • A neighbor disagrees about where the line sits
  • The permit office asks for a survey or site plan with the application

Permit requirements can vary by municipality, county, and project type. A pool, an addition, and a septic system may each have different paperwork. Confirm with your local permit office early, because waiting on a survey can push back your start date.

Checking Property Setbacks and Easements Near Excavation Areas

Owning the land doesn’t always mean you can dig anywhere on it. Setbacks are the minimum distances that structures must stay from property lines, and they’re set by local zoning rules. A pool shell or retaining wall that crosses a setback line may fail inspection even if it stays inside your boundary.

Easements are rights that let someone else use part of your property for a specific purpose. Utility, drainage, and access easements are common on residential and commercial lots. Digging inside one can damage buried lines, block water flow, or break the terms of the easement. Your plat, title commitment, and survey are the best places to find them.

Before any digging, contact 811 to have public utility lines marked. That service covers many underground lines, but private lines like irrigation, septic, or private electrical runs may not be included. Ask your contractor how they’ll handle anything the locate doesn’t show.

Coordinating Survey Findings With Excavation Plans

A survey only helps if the people digging actually use it. Share the survey drawing with your excavation contractor, designer, and engineer before work starts. Make sure the site plan shows the dig area, the property lines, setbacks, and easements on one sheet.

Ask your surveyor to stake the lines or set offset stakes near the work area. Offset stakes sit a known distance from the true line, so they stay useful even after the ground is torn up. Tell your crew not to move or drive over them.

Plan for the space the job needs beyond the hole itself. Spoil piles, equipment paths, and material staging can drift onto a neighbor’s lot without anyone noticing. If you need temporary access across adjacent land, get written permission first. A short talk with the neighbor before the job starts usually prevents the bigger argument later.

Frequently Asked Questions

Can I find property lines myself before excavation?

You can review your deed, plat, and old surveys, and you may be able to uncover corner markers. That research gives you a general idea of where the boundary sits. It isn’t the same as a legal survey, and markers may have moved over the years. For digging near the line, a licensed surveyor is the safer choice.

Are online county maps accurate enough for excavation planning?

They’re useful for a quick overview. Most county GIS maps are approximate and can be off by several feet. They aren’t designed to locate legal boundaries. Use them for orientation and rely on a survey for any work near the line.

How long does a boundary survey take?

Timing depends on the size of the property, the condition of the records, and the surveyor’s schedule. Simple residential lots often move faster than large or irregular parcels. Missing markers or conflicting records can add research time. Order the survey early if a permit or excavation date depends on it.

Posted in boundary surveying | Tagged boundary survey

Post navigation

← Older posts
Newer posts →

Contact Us!

© Fort Myers Land Surveying
Fort Myers , Florida
Phone: (239) 800-0481

Privacy Policy | Terms of Use

Web Development and SEO by:
SEO Company for Professionals

The owner of this website, USA Surveying & Engineering, LLC., provides coordination of professional land surveying and engineering services in all 50 states. The professional surveying and engineering services provided to you will be conducted by fully licensed professionals in your state.

↑